What we provide

  • Scheduled preventive maintenance
  • Annual testing calendar
  • Consumables & spares management
  • 24×7 breakdown response
  • Substation operation support
  • Compliance documentation

Why choose Tajalli Tech for electrical AMC and maintenance

At Tajalli Tech, we provide comprehensive annual maintenance contracts for substations, panels and complete facilities, structured around a preventive calendar supported by round-the-clock breakdown cover. Scheduled activities include thermography, breaker timing and contact-resistance testing, torque and insulation-resistance checks and earth-resistance measurement, ensuring developing faults are identified and addressed on schedule rather than under failure. Should a fault occur, the same engineers who maintain your installation provide 24x7 breakdown response, drawing on their existing knowledge of your site. Institutions including IIM Lucknow, Decathlon and SUEZ retain the company for this service.

What you get

You receive a documented, scheduled maintenance plan covering your substation, panels and earthing, with every visit logged, including thermal scans, insulation-resistance and breaker-test values, and torque and earth readings, so that condition can be trended year on year. Findings are graded by severity to guide prioritisation, and each reading is recorded in accordance with the applicable IS/IEC test standards.

What does the breakdown cover comprise?

It provides 24x7 response to faults on the systems we maintain, attended by an engineer already familiar with your switchgear rather than one encountering it for the first time. We support sites across Lucknow, throughout Uttar Pradesh and pan-India.

Is a shutdown required for routine visits?

The majority of the work is carried out live, as thermography and earth testing are performed under load. Breaker and insulation-resistance testing require the circuit to be de-energised, and we schedule these activities around a planned shutdown to keep disruption to a minimum.

Ready to get started?

Get a free assessment and quote from our engineering team.